Sign our petition: Take the Silvertown Tunnel out of planning, Sadiq

Sadiq Khan

We’ve launched a new petition to demand new mayor Sadiq Khan withdraws the Silvertown Tunnel from the planning system ahead of his promised review of TfL’s river crossing schemes.

During the election campaign, Mayor Khan pledged to look again at the proposals, acknowledging worries about the air pollution and congestion a new road crossing between the Royal Docks and Greenwich Peninsula would cause.

“We need a proper joined up review, looking at river crossings and improved public transport connections east of Tower Bridge,” he told website Transport Network in April.

He followed that up by telling Londonist: “My concern is that there’s not a proper plan to have crossings that don’t have an adverse impact on air quality, the environment and the people in the south east of London.

“What you should be thinking about is public transport, cycling.”

Mayor Khan told London Assembly members on Wednesday that he was reviewing the scheme, along with all the crossing proposals put in place under Johnson – but refused to withdraw it from the planning system.

Now the No to Silvertown Tunnel campaign is asking him to:

– Show us he is serious about his commitment to tackle pollution by withdrawing the Silvertown Tunnel proposal from the planning system immediately.

– Fully review the Silvertown Tunnel – taking into account all views, instead of relying on Transport for London’s flawed modelling – and other crossing schemes planned east of Tower Bridge.

Pre-construction costs for the tunnel are £107m, according to documents submitted to the Planning Inspectorate. The full cost of building the tunnel will be at least £1 billion.

Our petition can be found at www.toxictunnel.co.uk.

Can we trust the proposal after pollution cover-up?

Since Mayor Khan was elected, it has been revealed his predecessor covered up report that made clear the effects of air pollution in the boroughs that will be affected by the Silvertown Tunnel, such as Newham, Tower Hamlets, Greenwich, Lewisham and Southwark.

The planning documents for the tunnel review that the planning costs alone have hit £107m – with the total bill already reaching the £1 billion mark. Cutting costs at TfL was one of Mayor Khan’s election promises.

“We never had much faith in the congestion and pollution assessments for the Silvertown Tunnel, but the shocking revelations about pollution and primary schools mean the new mayor must urgently review City Hall’s roadbuilding plans,” No to Silvertown Tunnel chair Anne Robbins says.

“Nobody is denying Blackwall Tunnel congestion isn’t a problem, but the Silvertown Tunnel will only make the situation worse. Even a tunnel for ‘cleaner vehicles’ would just send more polluting traffic into local areas to head to the Rotherhithe Tunnel. The planning costs alone are £107m – money TfL could put to better use elsewhere.

“Sadiq Khan needs to pull the scheme out of planning, and urgently look again at a scheme that will damage the lives of communities across east and south-east London.”

Sign up NOW to have your say on the tunnel later

For now, the tunnel remains in the planning system, so if you object to the tunnel, please sign up to the Planning Inspectorate website so you can register to have your say.

Planning Inspectorate form

Firstly, visit this website:
http://infrastructure.planninginspectorate.gov.uk/projects/london/silvertown-tunnel/

Secondly, scroll down, and fill in your email address on the right-hand side of the page.

This will make sure you have the opportunity to have your say on the tunnel should it stay in the planning system. But please, make sure you also tell Sadiq Khan to pull the plug on it: www.toxictunnel.co.uk.